GEDNEY POOLS
SOUTHPORT, CONNECTICUT
THE TOWN SERIES
Southport
Custom Gunite Pool Construction in Southport, Connecticut

The harbor is a public way.

CT HIC #0704131
CT SPB #SPB.0000169
A WORD ON BUILDING IN SOUTHPORT
GEDNEY POOLS
02 / 14
THE VILLAGE

Settled in 1639, burned in 1779, rebuilt by the families who ran the harbor.

Southport burned with the rest of Fairfield in 1779. The houses that stand along the harbor today were built afterward, when Southport onions left this waterfront by the hundred thousand tons a year.

1971
NATIONAL REGISTER HISTORIC DISTRICT
More than 150
CONTRIBUTING STRUCTURES, MOST FEDERAL AND GREEK REVIVAL
Harbor Road, Pequot Avenue, Main Street, Westway, Willow Street
THE STREETS OF THE DISTRICT
GEDNEY POOLS
03 / 14
THE HISTORIC DISTRICT COMMISSION HANDBOOK, THE SENTENCE THAT GOVERNS EVERYTHING

The commission reviews what is visible from a public way.

A public way includes streets, rights of way, parks, the railroad and waterways.

Southport Harbor is the southern boundary of the district.

The commission's jurisdiction applies inside the Southport Historic District. On the water side of Harbor Road, the view from the harbor is a public view, and the pool is in it.

GEDNEY POOLS
04 / 14
THE COMMISSION CALLS THE GARDEN A STRUCTURE
STRUCTURES
Fences
Walls
Earthworks
REQUIRE AN APPLICATION
Driveways
Walks
Terraces
including their edging and decorative detail
GEDNEY POOLS
05 / 14
WHAT THE POOL APPLICATION SHOWS
Outline
Coping
Paving
Anything above grade

The commission is not reviewing whether there is a pool. It is reviewing the coping.

Raised gunite pool with a vanishing edge beside a shingle house, harbor water and distant sails beyond
GEDNEY POOLS
06 / 14
CONNECTICUT GENERAL STATUTES 7-147a THROUGH 7-147k, THE CALENDAR

The design is decided before the hearing, not after it.

Monthly meetings
A public hearing
A decision within 65 days
OF THE HEARING

The drawing is finished before the hearing, because after it the next meeting is a month away.

GEDNEY POOLS
07 / 14
CONNECTICUT GENERAL STATUTES 22a-109, THE SECOND DESK IS THE COAST

A coastal site plan for a building, use or structure fully or partially within the coastal boundary.

MAY BE EXEMPTED

Residential accessory work, and the statute names swimming pools in that list.

NEVER EXEMPT

Shoreline flood and erosion control structures.

Which side of that line a raised pool wall on a harbor slope falls is a question of how it is designed and described. It is answered on the drawing, not at the counter.

Fairfield carries the review in Section 34 of its regulations, with Section 20 on flood protection beside it.

GEDNEY POOLS
08 / 14
THE RULES ARE NEW, AND THEY MOVED TWICE THIS YEAR

A pool drawn to last year's rules is drawn to the wrong rules.

September 6, 2025
Rewritten zoning regulations take effect.
February 17, 2026
Amended for the regulations and definitions of swimming pools and spas.
April 28, 2026
Amended for pools in the VE and AE flood zones.

Two pool amendments in one spring.

GEDNEY POOLS
09 / 14
CHAPTER 93 OF THE TOWN CODE, THE ORDER OF SIGNATURES

No residential swimming pool may be constructed, installed or altered prior to approval from the Director of Health, with zoning and building permits issued subsequently.

FIRST
Director of Health
THEN
Zoning
THEN
Building

Inside the district, the Historic District Commission's certificate sits in that line as well.

The barrier standard in the same chapter: not less than four feet, gates self-closing and self-latching.

GEDNEY POOLS
10 / 14
THE COVER IN PLACE OF THE FENCE

Under the building code in force in Connecticut today, a powered automatic safety cover can satisfy the barrier requirement.

On a harbor-side lot that can mean no fence between the house and the water.

The state's code revision that would change this has not been adopted. Grandfathering runs on the permit application date.

Confirmed at application, not assumed.

GEDNEY POOLS
11 / 14
THE GRADE

The water side of Harbor Road drops to the harbor through terraces and walls built over generations.

Where the slope falls toward the water, the downhill wall of the pool can be the retaining wall and carry the edge at the same time, one structure doing two jobs rather than a second structure hung on the bank.

Existing walls are surveyed and assessed before anything is designed above them, and a licensed engineer is part of any harbor-side project from the start.

Vanishing-edge gunite pool on a lawn that falls away to a rocky shoreline below a white clapboard house
GEDNEY POOLS
12 / 14
FOUR DESKS IN ONE VILLAGE
The Director of Health
The Historic District Commission
The coastal site plan
Zoning and building

We prepare every one of them and present them.

GEDNEY POOLS
13 / 14
SUPERVISION

A Gedney walks every phase of every shell.

Layout through commissioning, the same person is on the ground for it. Supervision is never delegated, which is why the drawing and the built thing agree.

On a lot the commission sees from the water, the drawing that goes to the hearing is the drawing that gets built.

LAYOUT
EXCAVATION
STEEL AND SHOTCRETE
TILE AND COPING
COMMISSIONING
Gunite pool lit from within at dusk, water sheeting over a vanishing edge toward open water
GEDNEY POOLS
14 / 14
SOUTHPORT, CONNECTICUT

The harbor is a public way.

Come walk the land before a shape is chosen. We will read the lot from the water as the commission will, survey the walls that already hold the grade, and finish the drawing before the hearing.

CUSTOM GUNITE POOL CONSTRUCTION
(203) 302-9920
$200,000+
CUSTOM GUNITE CONSTRUCTION IN SOUTHPORT STARTS HERE
CT HIC #0704131 | CT SPB #SPB.0000169

Gunite Pool Builder & Contractor in Southport, CT

Harbor village of Fairfield, where the historic district, the coastal boundary and the grade down to the water shape every pool

Custom gunite pool by Gedney Pools serving Southport, CT

Serving all of Fairfield County. Gedney Pools builds across the county, from the Gold Coast shoreline to the northern towns. See the luxury pool builder in Fairfield County, CT overview, or read on for what building in Southport specifically involves.

Pool Construction in Southport

Southport is a village inside the Town of Fairfield with its own ZIP code, its own Metro-North station and its own harbor, set between the Mill River and Sasco Brook on the Westport line. It was settled in 1639, burned with the rest of Fairfield in 1779, and rebuilt by the shipping families who ran the harbor through the nineteenth century, when Southport onions left this waterfront by the hundred thousand tons a year. What they built is still standing: a National Register historic district of more than 150 contributing structures, most of them Federal and Greek Revival, along Harbor Road, Pequot Avenue, Main Street, Westway and Willow Street. Gedney Pools LLC provides Southport homeowners with custom gunite pool construction designed for that setting: the historic district, the coastal boundary and the grade down to the water. CT HIC #0704131, CT SPB #SPB.0000169.

Southport's Landscape and Pool Design

The water side of Harbor Road drops from the road to Southport Harbor, often through terraces and retaining walls built over generations. Sasco Hill rises above the beach on the other side of the village. Between them sits the flattest ground in Southport, and the least of it. On a harbor-side lot the first question is where the usable lawn sits relative to the base flood elevation, because that decides whether the pool, the equipment pad and the electrical are floodplain structures, and everything else follows from that line. Equipment access from Harbor Road down to the lawn is frequently the constraint that decides what can be built, and it is checked on the first visit rather than discovered on the first day of excavation.

Custom gunite is the right method for Southport pool construction. Gunite allows a custom shape that fits a terraced site, an engineered shell that can be founded independently of walls built decades ago, and a raised downhill wall that can carry a vanishing edge and hold the grade at the same time, one structure doing two jobs rather than a second structure hung on the bank. Existing terrace walls are surveyed and assessed before anything is designed to sit above them, and a licensed engineer is part of any harbor-side project from the start. Finishes are chosen for a Federal or Greek Revival house rather than pulled from a brochure: natural stone coping and terrace work that matches the existing masonry, a cover housing that disappears, equipment placed where no public way can see it.

The Harbor, the Village and Outdoor Living

Southport's life runs to the water. The Pequot Yacht Club sits on Harbor Road, the Pequot Library has anchored the village since 1887, and the beach at the foot of Sasco Hill is a short walk from most of the historic district. A pool here is rarely the only outdoor room; it sits among terraces, gardens and views that were laid out long before it. That is the design brief. A spa built into the pool, an automatic cover, and stone that reads as part of the property from the road and from the harbor are the elements Southport homeowners ask for, and they are the elements the village's review process is built to protect.

Permitting and Regulatory Landscape

Inside the Southport Historic District, the Fairfield Historic District Commission reviews any new construction or exterior alteration visible from a public way, and it defines a public way to include waterways as well as streets, rights of way, parks and the railroad. On a harbor-side lot, the view from the water counts. The commission's own handbook treats fences, walls and earthworks as structures; requires an application for driveways, walks and terraces including their edging and decorative detail; and requires an in-ground pool application to show the outline, the coping, the paving and anything that rises above grade. The commission meets monthly and acts within 65 days of the public hearing it sets. That is a design brief, not an obstacle. We prepare the application and present it, and design decisions that will be reviewed are made with the review in mind from the first drawing.

Much of Southport's waterfront sits inside Connecticut's coastal boundary, where the Coastal Management Act requires a coastal site plan for structures fully or partially within it. Fairfield's zoning regulations, rewritten in 2025, carry their own coastal site plan section and a flood protection section, and in 2026 the town adopted specific regulations for swimming pools and for pools in the VE and AE flood zones. Fairfield's health code adds a step most towns do not: approval from the Director of Health comes before the zoning and building permits, and the barrier standard is at least four feet with self-closing, self-latching gates. Under the building code in force today a powered automatic safety cover can satisfy the barrier requirement, which on a harbor lot can mean no fence between the house and the water; the code is under revision, so that is confirmed at permit application, not assumed. We establish which of these apply before design begins, handle every filing as the homeowner's authorized agent, and ask the town general code questions rather than volunteering a property's conditions. Our difficult permits page covers how that works.

Pool Installations Suited to Southport Properties

Investment and Timeline

Custom pool construction in Southport starts at $200,000 and goes up from there, depending on site complexity, finish selections, and integrated features. Harbor-side sites with grade, coastal review and historic district review carry more engineering and more process than a flat inland lot, and the proposal reflects that. Construction timelines run 12 to 20 weeks from groundbreaking; permitting in the historic district or the coastal boundary adds review time before construction begins. We provide line-itemized proposals after a thorough site evaluation and design consultation.

Pool Planning Resources

Frequently Asked Questions -- Pool Construction in Southport, CT

Does the Historic District Commission review a swimming pool in Southport?

If the property is inside the Southport Historic District and the work is visible from a public way, yes. The Fairfield Historic District Commission's handbook treats in-ground pools, fences, walls, earthworks, terraces and walks as reviewable, and defines a public way to include waterways as well as streets. The commission meets monthly and acts within 65 days of the public hearing it sets. We prepare the application and present it.

Is a Southport waterfront pool subject to coastal site plan review?

Properties within Connecticut's coastal boundary fall under the Coastal Management Act, and Fairfield's zoning regulations carry their own coastal site plan and flood protection sections plus 2026 rules for pools in the VE and AE flood zones. Which apply depends on the parcel and on where the pool sits vertically relative to the base flood elevation. We establish that before design begins.

Who approves a residential pool in Fairfield, and in what order?

Fairfield's town code requires approval from the Director of Health before the zoning and building permits, with a barrier of at least four feet and self-closing, self-latching gates. In the historic district or the coastal boundary, those reviews sit in front of the building permit as well. Gedney Pools handles every filing as the homeowner's authorized agent.

What does a custom pool cost in Southport?

Custom gunite installations in Southport start at $200,000 and go up from there. Harbor-side sites with grade, coastal review and historic district review carry more engineering and more process than a flat inland lot, and the proposal reflects that after a site visit.

Build Your Southport Pool

Gedney Pools LLC constructs custom pools for Southport's harbor-side and historic district properties. Site visits are free and without obligation, and on a harbor lot the visit is where the real answer starts. To begin the conversation, call (203) 302-9920 or email info@gedneypools.com.

CT HIC #0704131 • CT SPB #SPB.0000169

Follow this work in Google Search.