Golden hour over a Gedney Pools custom gunite infinity pool in Fairfield County, Connecticut
GEDNEY POOLS
DARIEN, CONNECTICUT
CUSTOM GUNITE CONSTRUCTION
The Architecture of Water

The physics, craftsmanship, and design freedom of the custom dry-mix gunite shell - built for New England, built for generations

Aerial view of a finished Gedney Pools freeform custom gunite estate pool in Fairfield County
GEDNEY POOLS
02 / 15
THE GEDNEY PHILOSOPHY

True Luxury Is Structural

In luxury estate construction, the enduring value of a waterscape lives beneath its surface finish - in its structural core.

A true generational pool is an engineered monolith: a shell that holds its geometry against hydrostatic pressure, saturated soil, and decades of New England winters - so the beauty above the waterline never has to compromise.

5,000
PSI SHELL STRENGTH
$200,000+
ARCHITECTURAL ASSET
GEDNEY POOLS
03 / 15
DESIGN FREEDOM

Liberated from the Mold

The Factory Constraint

Pre-formed shells are shaped by molds and limited by what a highway trailer can carry.

Pneumatic Freedom

Curvilinear forms, monolithic spas, vanishing edges - shaped in place, exactly as drawn.

Because dry-mix gunite is pneumatically projected at high velocity, it compacts instantly upon impact - holding its shape on fully vertical slopes without double-sided formwork. We are not constrained by highway transport dimensions or factory molds. If an architect can draw it, our nozzlemen can shoot it: infinite geometric freedom, seamless monolithic spas, and complex curvilinear forms.

GEDNEY POOLS
04 / 15
CHOOSING YOUR STRUCTURE

The Case for Custom Gunite

CUSTOM DRY-MIX GUNITE

What Gunite Makes Possible

Infinite Geometry

Any shape, any depth profile, any water feature - designed to the site, not to a mold.

Monolithic Strength

A single 5,000 psi concrete shell with no seams, panels, or liner joints.

Engineered for Winter

Designed for ACI Class F3 freeze-thaw exposure - the most demanding classification.

A Generational Asset

Permanent construction that appreciates with the estate and serves the next generation.

Fiberglass

A factory-molded shell delivered by highway and set into the excavation. Shapes and dimensions follow the manufacturer's catalog, and size is limited by road transport.

Vinyl

A flexible liner fitted over engineered panel walls and a prepared floor. Geometry follows the panel system, and the liner is refreshed on a periodic replacement cycle.

GEDNEY POOLS
05 / 15
THE CRAFT OF PLACEMENT

The Kinetic Compaction Engine

Air: 250-350 cfm Dry aggregate and cement Water at the nozzle 350-400 ft/s exit velocity Receiving substrate

A Gedney pool is not poured - it is pneumatically driven.

Material meets the receiving substrate at up to 80 mph. That transfer of kinetic energy compacts the matrix in the instant of placement, expelling entrapped air and achieving an ultra-dense state of 135 to 145 lbs per cubic foot.

5,000 psi

A compressive strength conventional poured concrete cannot match.

GEDNEY POOLS
06 / 15
STRUCTURAL PHYSICS

The Geometry of Permanence

The curved radius where the pool floor meets the vertical wall is not an aesthetic tradition - it is advanced structural physics.

WALL SECTION - FORCE DIAGRAM
External soil and hydrostatic pressure Resisting force of the concave arch Waterline

The Concave Arch

By engineering a structural curve at the transition point, we put the immense weight of the concrete shell itself to work - actively pushing back against external soil pressures.

Stress Distribution

The geometric arch carries subterranean loads smoothly across a monolithic concrete matrix - no 90-degree corners, no concentrated stress points, only continuous strength.

GEDNEY POOLS
07 / 15
REGIONAL ENGINEERING

Mastering the New England Winter

Fairfield and Westchester winters ask more of a subterranean structure than almost any climate in the country. We treat that as a design brief, not an obstacle.

I

ACI Exposure Class F3

Every Gedney shell is designed to the most demanding freeze-thaw exposure classification in the ACI code - concrete in continuous contact with moisture and cyclic freezing.

II

Saturated Winter Ground

Coastal Connecticut and New York soils hold winter groundwater against the shell for months. The structure is engineered for that saturation as its normal operating state.

III

The 91.7% Threshold

Water expands 9% when it freezes. If a concrete's capillary pores pass 91.7% saturation, expanding ice pressurizes the matrix from within. Gedney concrete is engineered to stay far below that threshold - which is why it endures.

A pool that masters its climate is a pool that keeps its promises for decades.

GEDNEY POOLS
08 / 15
THE MIX DESIGN

A Shell Engineered to Stay Dry

Freeze-thaw mastery begins at the microscopic level: a concrete matrix so dense that winter moisture simply has nowhere to go.

DENSIFIED MATRIX - MAGNIFIED

Ultra-fine silica particles pack the voids between cement grains, closing the capillary network.

0.35-0.40

Water-Cement Ratio

Held strictly low to minimize pore creation from the first moment of hydration.

Type II

Sulfate-Resistant Cement

A formulation chosen for coastal and wetland groundwater chemistry, protecting the shell from within.

100x

Silica Fume Densification

Spherical particles one hundred times smaller than cement grains pack the microscopic voids, bringing permeability to near zero and keeping the shell far from the critical saturation threshold.

GEDNEY POOLS
09 / 15
LOGISTICS AS CRAFT

Unlimited Staging, Uncompromised Quality

CONVENTIONAL WET-MIX

Racing the Hydration Clock

Ready-mix concrete begins hydrating the moment it leaves the plant. Under ASTM C94, it must be placed within 90 minutes - a demanding window when winding estate driveways and congested corridors sit between the plant and the site.

Plant - highway - site: the schedule belongs to the truck.

THE GEDNEY DRY-MIX METHOD

Hydration Begins at the Nozzle

Dry materials are staged on site and conveyed pneumatically through a small footprint. Because water is introduced only at the nozzle, there is no 90-minute clock - the material is always fresh at the moment of placement.

The result is unlimited architectural staging time: complex geometry can be shot with patience and precision, on the craftsman's schedule rather than the truck's.

Gentle on sensitive drives and landscaping - a small-footprint operation.

GEDNEY POOLS
10 / 15
THE HUMAN ELEMENT

The Master Nozzleman

Because water is introduced at the nozzle, the ultimate structural integrity of a dry-mix shell rests in the hands of the nozzleman - decades of hand-eye craft, and the single most important quality variable on the project.

90° ± 10°

Perpendicular impact, held strictly to prevent sand lensing within the shell.

2-5 ft

Stand-off distance, tuned continuously to the geometry being shot.

The Sheen

Reading the surface of the concrete in real time to hold a perfect 0.35-0.40 water-cement ratio, while coordinating with the blowpipe operator to encase the steel skeleton without voids.

Hand-set natural stone coping detail on a Gedney Pools custom gunite pool
GEDNEY POOLS
11 / 15
COMPOSITE ACTION

The Steel Skeleton

A pool is only as strong as its composite action. Every Gedney shell is built to an engineered, stamped reinforcing schedule - every bar sized, spaced, and tied to the structure's real loads.

WALL STEEL SCHEDULE - SECTION
#4 beam bars To 6 ft deep #4 @ 9 in. vert., 12 in. horiz. 6 to 9 ft deep #4 @ 6 in. vert., 8 in. horiz. 6 in. floor - #3 @ 12 in. both ways

A Schedule That Deepens with the Pool

Deformed bars on a stamped engineered schedule: #4 bars at 9-inch vertical and 12-inch horizontal spacing to 6 feet of depth, tightening to 6-inch and 8-inch centers where the water pushes hardest, from 6 to 9 feet.

The Bond Beam and Every Bench

#4 beam bars ring the perimeter at the coping, and reinforcement continues through every step, bench, and sun shelf - with each rebar intersection individually tied.

Complete Encasement

The 6-inch floor carries #3 bars at 12-inch centers both ways, and 90-degree high-velocity shooting wraps the concrete perfectly around the steel - one composite structure.

GEDNEY POOLS
12 / 15
THE PREPARED INTERFACE

Monolithic by Method

When a project is built in phases, Gedney's prepared interface rule ensures each day's work bonds into a single continuous structure.

JOINT DETAIL - SECTION
45° bevel Existing shell chipped to saturated surface-dry (SSD) Next phase shot at 80 mph

The 45-Degree Bevel

Unfinished edges are sloped to a clean 45-degree profile, preventing the entrapment of rebound and dry sand at the joint.

Mechanical Interlock

The interface is chipped to a rough, saturated surface-dry (SSD) state - an open texture ready to receive the next phase.

A 260-300 psi Bond

At 80 mph impact, paste-rich shotcrete drives directly into the open pore structure, achieving tensile bond strengths of 260-300 psi - pure mechanical integrity, with no reliance on chemical bonding agents.

GEDNEY POOLS
13 / 15
THE PATIENCE OF CRAFT

The Cure: Locking In Watertightness

Day 0 Day 7 Day 14 Day 28 Compressive strength - 5,000 psi Capillary permeability CONTINUOUS WET CURE WINDOW

The engineering is not finished when the shooting stops. If concrete dries prematurely, hydration halts - the shell never reaches the density it was designed for.

The Gedney Cure

A continuous wet cure for a minimum of 7 days - and we champion the 28-day extended cure. Keeping the shell saturated lets the cement hydrate fully, permanently shrinking the capillary pores and reducing the concrete's absorptive capacity by over half before a single drop of pool water is introduced.

Patience, engineered - the quiet final step that locks in watertightness for decades.

GEDNEY POOLS
14 / 15
THE GEDNEY STANDARD

Anatomy of a Generational Asset

SHELL CUTAWAY - SECTION
Waterline Coping and deck
1

Compacted Crushed-Stone Base

A minimum 6 inches of compacted crushed stone providing uniform vertical support.

2

Engineered Steel Curtain

Bar spacing that tightens with depth, every intersection tied, reinforcement through every step and bench.

3

5,000 psi High-Velocity Gunite

80 mph compaction achieving an ultra-dense, void-free shell.

4

Curved Structural Radius

The geometric arch carrying external soil pressure with ease.

5

Silica-Fume Densified Matrix

The microscopic density that masters the F3 freeze-thaw climate.

Sunset over a Gedney Pools freeform gunite estate pool, ready for a family summer

Built for a Century, Not a Season

A Gedney Pools custom gunite shell is a masterwork of structural physics - a $200,000+ architectural asset engineered to add permanent, generational value to your estate, and to hold its beauty for every summer your family gathers around it.

Gedney Pools LLC | Darien, CT | (203) 302-9920 | CT HIC #0704131 | CT SPB #SPB.0000169

Gunite Pool Contractor & Custom Construction Near Fairfield County, CT

Generations of craftsmanship meets modern engineering. We build one-of-a-kind gunite pools for Connecticut's most discerning homeowners - from excavation through final plaster.

Searching for "gunite pool contractors near Fairfield County" or "gunite pool builder near me"? Gedney Pools is both. Gunite pool builder and gunite pool contractor are interchangeable terms for the same trade. We are licensed, insured, and based near Fairfield County, CT.

Why Is Gunite the Gold Standard in Luxury Pool Construction?

Gunite pool construction is the only method used by serious luxury pool builders and pool contractors near Fairfield County, and for good reason. Unlike prefabricated fiberglass shells or vinyl-lined pools, a gunite pool is built entirely on-site, from the ground up, to your exact specifications. Every curve, depth transition, bench, tanning ledge, and spillover is engineered and formed to match the precise vision you and your architect have for the property.

At Gedney Pools, gunite construction is our flagship service. Owner John C. Gedney III brings deep, hands-on Connecticut pool-construction experience and an obsessive commitment to structural integrity, material quality, and detail. Every gunite pool we build is engineered to last decades and finished to a level that matches the architecture and landscape it sits in.

We are fully licensed by the State of Connecticut - CT HIC #0704131 and CT SPB #SPB.0000169 - and we carry the insurance, bonding, and trade relationships that come from decades of building in this market.

Investment Range: Custom gunite pools in Fairfield County typically range from $200,000 to $500,000+, depending on size, site conditions, design complexity, and selected finishes. Pools with vanishing edges, spas, water features, and premium materials (natural stone coping, glass tile, pebble finishes) fall toward the upper end. We provide detailed, transparent proposals after an on-site consultation.

Our Gunite Construction Process: 10-16 Weeks, Start to Finish

Every Gedney pool follows a proven, phase-by-phase construction process. Here is exactly what to expect from the day we break ground to the day you fill the pool:

01

Excavation & Site Preparation

Heavy equipment removes earth to the engineered dimensions. On rocky Fairfield County lots, we bring in rock hammers or blasting specialists as needed. Spoils are removed or repurposed for grading. Typical duration: 2-5 days depending on soil and rock conditions.

02

Steel Reinforcement

A cage of #4 rebar is tied on 12-inch centers throughout the pool shell - floor, walls, benches, and any integrated spa. This structural steel framework is what gives a gunite pool its permanent strength. We use chairs and tie wire to maintain precise positioning before the shoot. Duration: 3-5 days.

03

Plumbing & Electrical Rough-In

All return lines, suction lines, main drains, skimmer plumbing, LED light conduits, and autofill lines are installed and pressure-tested before gunite application. We use Schedule 40 PVC and rigid conduit exclusively - no flexible pipe shortcuts. Duration: 2-3 days.

04

Gunite Application

The gunite crew pneumatically shoots a dry mix of cement and sand onto the steel framework at high velocity, building up the shell to a minimum of 8 inches thick. This is the day the pool takes its permanent shape. The shell is then hand-troweled smooth and left to cure. Duration: 1-2 days for the shoot, then 7-10 days curing.

05

Tile, Coping & Stonework

Waterline tile is set (glass, porcelain, or natural stone), coping is installed around the pool perimeter (bluestone, limestone, travertine, or poured concrete), and any raised walls or water feature stonework is completed. This phase defines the pool's visual character. Duration: 1-3 weeks.

06

Equipment Installation

Pumps, filters, heaters, salt chlorine generators, chemical controllers, and automation systems are installed on the equipment pad. We spec commercial-grade equipment from the leading manufacturers and program full automation so the entire pool can be controlled from your phone. Duration: 3-5 days.

07

Decking & Landscape Integration

Pool decking is installed - whether poured concrete, pavers, or natural stone - and we coordinate with your landscape contractor for final grading, planting, and drainage. We ensure proper pitch away from the pool to prevent runoff contamination. Duration: 1-2 weeks.

08

Interior Finish (Plaster/Pebble)

The final interior surface is applied - standard white plaster, colored quartz aggregate, or premium exposed-pebble and polished-aggregate finishes. The pool is immediately filled with water, and our startup technician manages the critical 28-day chemistry protocol to ensure a flawless, long-lasting finish. Duration: 1 day application + 28 days startup.

What Sets Gedney Pools' Gunite Construction Apart?

There are pool builders, and then there are pool builders. In a market where the lowest bid often wins, here is what separates Gedney Pools from the competition:

  • Decades of CT expertise: Owner John C. Gedney III brings deep, hands-on knowledge of Connecticut soil conditions, engineering requirements, and construction methods specific to Fairfield County and the broader northeast.
  • Structural-first philosophy: We over-engineer the structure so the pool shell lasts 50+ years without cracking, settling, or failing. Minimum 8-inch shell thickness, #4 rebar on 12-inch centers, proper drainage behind retaining walls, and engineered footings on every project.
  • Architect and GC coordination: We work seamlessly with architects, landscape architects, and general contractors on luxury home builds. We understand AIA billing, construction schedules, and professional coordination at the highest level.
  • Permit mastery: We know the zoning codes, setback requirements, health department procedures, and review board expectations in every Fairfield County town. Our permit packages are thorough, and our approval rate is near-perfect.
  • Premium materials only: We do not cut corners on materials. Schedule 40 PVC, commercial-grade equipment, properly specified tile and coping, and interior finishes applied by certified applicators.

Which Properties Are Ideal for Gunite Pool Construction?

We build gunite pools on every type of residential property throughout Fairfield County and into Westchester County, NY. Whether your lot is flat, sloped, wooded, or sits on solid Connecticut ledge rock, we have the experience and equipment to build a spectacular pool.

Our most common projects include:

  • Large estate properties in Greenwich, Darien, and New Canaan
  • Hillside lots requiring retaining walls and vanishing-edge engineering
  • Waterfront properties along Long Island Sound
  • New construction luxury homes built by top general contractors
  • Properties with challenging access, rock, or high water tables
  • Historic properties requiring sensitive integration with existing architecture

Frequently Asked Questions

Gunite Pool Construction FAQ

Custom gunite pools in Fairfield County run $200,000 to $500,000+ depending on size, complexity, site conditions, and features. A straightforward 16x32 rectangular pool with basic coping starts near $150K. A vanishing-edge pool with spa, water features, and premium finishes on a hillside lot can exceed $500K.

A typical custom gunite pool takes 10 to 16 weeks from excavation to completion. The timeline depends on pool complexity, weather conditions, municipal permit timelines, and coordination with other trades on the project. We build detailed construction schedules at the start of every project and keep clients informed at every phase.

Fall is one of the best times to start a custom pool build in Connecticut. Cooler temperatures are easier on construction crews, concrete and gunite cure more consistently without extreme summer heat, and trade availability improves as the peak building season winds down. A fall start puts excavation, steel, gunite, and plumbing in the ground before winter. Masonry, coping, equipment, and finishes resume in early spring, and the pool is ready — or nearly ready — for the next swim season. Starting in September or October is ideal for a June completion.

Gunite is cement, sand, and water applied pneumatically over a reinforced steel framework. Unlike fiberglass shells (pre-made shapes) or vinyl liners (replaced every 7-10 years), gunite pools take any custom shape and last for decades with proper maintenance. It is the structural standard for luxury pool construction in Fairfield County.

Yes. Connecticut requires building permits for all in-ground swimming pool construction. You will also need health department approval, zoning compliance (setbacks, lot coverage calculations), and potentially wetlands or inland-wetlands permits depending on your property. Gedney Pools handles the entire permitting process - we know the requirements and review boards in every town we serve. Learn more about our permit services.

Absolutely. Some of our most striking pools are built on challenging hillside lots throughout Fairfield County. Sloped sites are actually ideal for vanishing-edge and infinity pool designs. We work with structural engineers to design proper retaining systems, manage drainage, and take advantage of the natural topography to create pools that look like they were always meant to be there.

Ready to Build Your Dream Pool?

Contact us for a free on-site consultation. We will walk your property, discuss your vision, and provide a detailed proposal.

(203) 302-9920
Email Us